OPS ACCESS

CFC × GUTTERSLAYER COMMAND

WIKI CFC×GSC
ESTIMATING · v2026-10-07 · v2.2
SYNCED TO ALL AGENTS

CORE PRICING MODEL

▾
CURRENTLabor: man-day pricing$525 × 1.75 × tier
CURRENTNeighborhood tiers: Budget / Middle / Affluent / Premium0.90 · 1.00 · 1.10 · 1.20×
CURRENTMaterials markup on landed cost× 1.75
CURRENTTrim-job waste / glue / fastener allowance+10%
Internal math (sq ft, LF, man-days) never shows on customer-facing lines — clean flat prices only.

GUTTERS — INSTALL

▾
CURRENT5" K-style seamless$10.50/LF
CURRENT6" K-style$13.50/LF
CURRENTDownspouts — 5" / 6" (same rate as gutter size, per Oct 25 2026 ruling)$10.50 · $13.50/LF
CURRENTTear out & haul away existing$1.85/LF
CURRENT6" strip miter$46.80
CURRENTDrop outlet / ground adapter$14 · $7.25
HISTORYPer-piece downspouts (retired)$66 / $85 ea
Hangers, standard elbows, end caps, outlets, sealant, cleanup: included. 5-year leak-free warranty on installs. Standard color white.

GUTTER GUARDS & SERVICE

▾
CURRENTSpectra LS Guard 5" / 6"$8.75 · $9.75/LF
CURRENTLeafBlaster Pro 5" / 6" — STAINLESS micromesh (app label wrong)$11.75 · $12.75/LF
CURRENTShurFlo 5"$9.50/LF
CURRENTGutter cleaning — starts at $125 · honor $99 door-hanger flyers$125+
VERIFYDrip-edge extension$4.00/LF
VERIFYReplacement hidden hangers (repairs)$5 ea
Repairs price as flat packages: reattach/reslope $150–550 · corner repair $425 · 40 LF 2nd-story replace $900.

EXTERIOR PAINT & CARPENTRY

▾
CURRENTEntry door$140
CURRENTGarage door$350
CURRENTGrid window exterior$145/window
CURRENTTrim/fascia 1×8 · 1×6 · 1×4 (cedar & LP SmartSide)$24 · $22 · $20/ft
CURRENTFiber cement siding R&R$45/section
VERIFYSoft wash (full house)$550
VERIFYShutters$120/set
VERIFYGutter/downspout painting$400–650
VERIFYStucco two-coat Loxon package$3,600–4,880
Caulking rule: siding-to-trim YES · siding joints NO. Combine prep+prime+paint per surface — one line, steps in the scope text. Itemize garage doors separately.

INTERIOR PAINT

▾
VERIFYWalls (~8' height, internal calc)$2.45/sq ft
VERIFYCeilings$1.25/sq ft
CURRENTBase / trim / casing paint$1.25/LF
VERIFYCrown & new-casing finish paint$4.45/LF
VERIFYInterior doors$80–150/door
Products: walls Emerald Flat · ceilings ProMar 200 · trim Emerald Urethane Semi-Gloss. Prime + 2 finish coats. Customer sees flat per-room prices, no sq-ft.

INTERIOR CARPENTRY

▸
VERIFYWainscoting / box panels install$7.45–12.75/sq ft
VERIFYBeadboard install / paint$12.20 · $6.45/sq ft
VERIFYBase install$5.75–8.75/LF
VERIFYDoor jamb install / paint$75 · $40/jamb
VERIFYWindow trim upgrade (single / double, w/ paint)$1,225 · $1,885
VERIFYDrywall patch/tape · misc package · skim coat$175 · $450 · $800
Steve is re-pricing this trade — every rate quotes as "around $X, confirming." Accent walls: moulding prep+paint rolls into one package price.

FLOORING & TILE

▸
VERIFYLVP labor / underlayment$5.75 · $1.00/sq ft
VERIFYCarpet removal~$2.10/sq ft
VERIFYHardwood refinish (600–700 sq ft)~$4,000 pkg
VERIFYShower tile — walls / floor$20 · $22/sq ft
VERIFYShower tear-out / bath floor tear-out$850 · $900
VERIFYCustom shower pan$800–1,000
VERIFYSubfloor repair — "if required," never buried$80/hr
Material responsibility must be explicit: CFC-supplied vs customer-supplied vs allowance. Hidden-substrate exclusion language on every flooring/tile estimate.

CABINETS

▸
CURRENTMethodology: Carter Lumber order = cost basiscost × 1.75 + man-days
CURRENTRef: ~38-piece kitchen install + Envirolak finish2 + 3.5 man-days
CURRENTThermofoil removal option — test one door FIRST$3,000
VERIFYReface: bathroom / kitchen (tracks & slides incl.)$500 · $850
HISTORYPer-face refinishing eras (retired)$185 → $145/face
Presentation rule: always a PACKAGE price on the estimate — never per-face.

DISCOUNTS & TERMS

▸
VERIFYSenior · Referral · Military (senior+referral stack)5% each
VERIFYPackage · Repeat customer · Holiday door8% · 10% · 20%
CURRENTDeposit / balance30% / completion
CURRENTCard processing fee3%
PAYMENT TERMS — STANDARD BLOCKA 30% deposit is due upon acceptance to schedule the project. The remaining balance is due upon completion. Check or QuickBooks bank transfer is preferred. Credit/debit card payments are subject to a 3% processing fee.
EXTERIOR PAINT WARRANTY — 5 YEARExterior painting includes a 5-year workmanship warranty covering premature peeling, flaking, blistering, or coating failure resulting from improper preparation or application. Normal weathering, ordinary color fading, moisture intrusion, substrate failure, structural movement, impact damage, and conditions outside CFC Contracting's control are excluded.
Discounts display as their own lines under the subtotal — never buried in line prices. Estimates valid 30 days.

SCHEDULING & ROUTING RULES

▸
Estimates on the CFC Contracting Google Calendar, status CONFIRMED. Title "Estimate — {Customer} ({TICKET}) — {Job type}". Customer email as attendee; phone in ticket AND event description.
After booking → transition to Estimates Scheduled (CC) / Estimate Scheduled (GSC).
ALL Angi leads → CC, even gutter jobs. Ambiguous gutter service leads: ask Steve.
Classify job type BEFORE picking a template — paint scope never opens a gutter estimate.

CONNECTED AGENTS

WhatsApp AssistantREADS LIVE
Dashboard ChatREADS LIVE
Claude CodeREAD / WRITE
Claude (chat)MCP — UPDATE 5

All agents fetch this doc before any estimate work. One edit here updates every brain.

TAG LEGEND

CURRENTStanding rate — quote it.
VERIFYLikely old — quote as "around $X, confirming."
HISTORYRetired — context only, never quoted.

UPDATE COMMANDS

Tell any agent a rate change → it routes to Claude → Claude pushes:

POST /webhook/knowledge-update {"doc":"estimating", "content":"…full md…"}

Read the live doc:

GET /webhook/knowledge?doc=estimating x-dash-key: ••••••••

OPEN RULINGS

1 · Carpentry + flooring re-pricing in progress
2 · Fix estimate app: LeafBlaster Pro says aluminum, is stainless
3 · More gutter clarifications coming from Steve

LEAD FLOW

▾
ANGI→CC (ALWAYS)→AUTO TICKET→INITIAL CONTACT
GUTTERSLAYER.COM→GSC→AUTO TICKET
ONELOCAL / GODADDY / DIRECT→CC OR GSC BY SCOPE
A lead still in Initial Contact = UNTOUCHED on the dashboard. Ambiguous gutter service/repair leads: ask Steve which company owns it (one was ruled CC).
Classify the job type BEFORE any template: paint scope never opens a gutter estimate, even when gutters are a painted surface.

PIPELINE STAGES

▾
BOTHInitial Contact → Estimate(s) Scheduled → Estimate In Progress → Follow Up
CCSold In Progress · Long Term Follow Up · No Qualified · Done
GSCWon In Progress · Service Orders · Repeating Contracts · Que For Quickbooks · Long Term Follow Up · No Qualified
Naming differs between projects ("Estimates" vs "Estimate" Scheduled, "Sold" vs "Won") — the dashboard merges them into one card per meaning and resolves the right transition per project automatically.
After booking an estimate: ticket moves to Estimates Scheduled / Estimate Scheduled.

TEAM & ASSIGNMENT

▾
CCRobin — office manager / estimator; default assignee for CFC tickets
GSCJason — field manager; default assignee for GutterSlayer tickets
BOTHSteve — owner-operator, mostly mobile via voice-to-text; final call on pricing

SCHEDULING RULES

▾
All estimate appointments → CFC Contracting Google Calendar, status CONFIRMED (never tentative, never device-local calendars).
Event title: "Estimate — {Customer} ({TICKET}) — {Job type}" · location = customer address · 1 hour default.
Customer email goes on the invite as attendee. Phone number lives in BOTH the Jira ticket description and the calendar event — retroactively if it arrives later.

THE AI CREW

▾
LIVEWhatsApp Assistant — tickets, estimates, transitions, calendar, QB customers; texts with Steve
LIVEDashboard + chat — pipeline board, drag moves, task checkoff, same brain as WhatsApp
LIVELead Intake + Angi Intake — auto-create tickets from incoming leads
LIVECrew Portal — Caleb/Jason/Robin see their jobs, photos, notes, mark-complete (crew.html)
LIVESecurity Audit — Claude Code reviews the server Mondays 6:00 AM
PENDINGMorning Digest — built, awaiting Meta WhatsApp template approval
ON CALLClaude Code — deploys and repairs via handoff briefs; Claude (chat) — architect & wiki editor
Every estimating agent fetches this wiki's rules before pricing anything.

QUICKBOOKS PROCESS

▾
Customer creation: tell the WhatsApp bot or dashboard chat "add QB customer for CC-XXX" — it pulls the ticket data and creates the customer.
Every estimate posts a plain-text QB block in the Jira comment for copy-paste (format in the Verbiage tab). Gutter estimates are also entered in QuickBooks.
Keep the QB entry and the Jira comment in sync when a price changes.

CREW PORTAL — LIVE

▾
URLdash.gutterslayer.com/crew.html — per-person codes, not the dash key
CALEBHand-picked CC jobs — tag a ticket with label crew-caleb to put it on his phone; untag or complete to remove
JASONGSC work queue — Won In Progress + Service Orders
ROBINCC tickets assigned to her
Crew see the field-trim only: customer, phone, address, scope, flags, photos. Pricing, measurement tables, and customer email never reach the crew view — so never paste pricing into those fields.
Mark Complete: CC → Done · GSC → Que For Quickbooks. Notes and completions are signed "via crew portal" with their name.
Assign via Claude: "put CC-631 on Caleb's portal." Revoke a person: remove from /root/.crew-codes + the workflow's CODES constants, then reactivate.

JIRA EXIT CHECKLIST

▾
Goal: replace Jira with our own Postgres job store when the time comes — every rule below keeps that door open.
RULENothing new talks to Jira directly — always through the n8n layer, so the backend swaps without touching any screen
RULECanonical stage names are ours (dashboard groups), never Jira's per-project spellings
TRIGGERJira free plan = 2GB total attachments; photo volume will hit it — that's migration day
TODOAt migration: jobs/comments/photos tables in Postgres · repoint n8n webhooks · copy tickets + attachments · nightly pg_dump backup habit FIRST
WATCHCheck attachment usage occasionally: Jira admin → billing/storage

IF SOMETHING BREAKS

▾
Dashboard/webhooks down but sites load → n8n issue: check the Automations pills, then ask Claude for the triage block.
Nothing loads, SSH dead → the Linode itself: cloud.linode.com → check status → reboot from panel. Everything restarts automatically.
After ANY downtime: glance at the Angi app — webhooks that fired during the gap never retry, so a lead could have been missed.
Known constraint: 1GB RAM box runs everything — heavy Claude Code sessions + big payloads can OOM it. Resize to 2GB plan is the standing recommendation.

PAYMENT & TERMS

▾
PAYMENT TERMS
A 30% deposit is due upon acceptance to schedule the project. The remaining balance is due upon completion. Check or QuickBooks bank transfer is preferred. Credit/debit card payments are subject to a 3% processing fee.
ADDITIONAL WORK
Work outside the scope of this estimate is not included. If concealed damage or additional repairs are discovered, the condition and pricing will be reviewed with the homeowner before additional work proceeds.
ESTIMATE VALIDITY
Estimate valid for 30 days.
WEATHER (EXTERIOR)
Scheduling is weather dependent.
Use scope-specific hidden-damage wording (fascia rot, siding removal, subfloor) — not broad boilerplate that reads evasive.

WARRANTIES

▾
EXTERIOR PAINT — 5 YEAR
Exterior painting includes a 5-year workmanship warranty covering premature peeling, flaking, blistering, or coating failure resulting from improper preparation or application. Normal weathering, ordinary color fading, moisture intrusion, substrate failure, structural movement, impact damage, and conditions outside CFC Contracting's control are excluded. Abnormal fading believed to be related to application will be evaluated. Covered warranty repairs include labor and coating of the affected area.
GUTTER INSTALLS
Installation includes a 5-year leak-free workmanship warranty.

PAINTING SCOPE BLOCKS

▾
GENERAL PAINTING
Painting includes normal surface preparation, protection of adjacent surfaces, minor patching/caulking as applicable, required priming, and two finish coats unless otherwise noted.
EXTERIOR PREP
Wash surfaces, scrape loose or failing paint, sand transitions, prime bare wood and cut ends, spot-prime as needed, caulk appropriate trim joints, fill nail holes, protect windows, roofing, concrete and landscaping, apply two finish coats, and clean up debris.
INTERIOR PREP
Light patching, caulking, and sanding as needed. Floors, fixtures, furniture, and adjacent surfaces protected. Minor wall repairs included unless substantial repair is specifically itemized. Two finish coats.
NEW WOOD
New wood will be primed and painted to match the existing trim as closely as possible.
COLOR
Final colors are to be confirmed before work begins. Existing colors will be matched as closely as practical where matching is required.
CLEANUP
Work areas will be cleaned and job-related debris removed upon completion.

THE CFC VOICE

▾
Pattern per line: what we're doing → what's included → important exclusion → price. Plain contractor language, never sales copy.
EXAMPLE LINE
Full Exterior Paint — $6,594. Prep and paint siding, trim, windows, dormers, bay window and two garage doors. Includes scraping, required priming, caulking and two finish coats. Front door, shutters, gutters and downspouts excluded.
DON'TS: no man-days shown · no sq-ft/LF when a flat price reads better · no repeated phrasing line to line · no oversized tables · optional work never inside the total · no artificial prep/prime/paint split charges · garage doors itemized, never buried.
Discounts display as their own lines under the subtotal ("5% Senior Discount: -$X") — never buried in line prices.

QUICKBOOKS BLOCK FORMAT

▾
Plain text in the Jira comment (never a markdown table — tables don't paste into QB). Per line: item name / short description / quantity math or "Flat = $X". End with the total. No item numbers.
EXAMPLE
Fascia Replacement Replace rotted 1x8 cedar fascia, rear elevation 40 ft @ $24/ft = $960.00 House Wash Soft wash siding, trim and soffits Flat = $550.00 Total = $1,510.00

HOW TO TALK TO THE BOT

▾
These are shapes, not magic words — say it however it comes out, voice-to-text typos and all. The bot figures it out. Include a ticket key (CC-677 / GSC-241) when you're talking about a specific job; relative dates ("tuesday at 5", "tomorrow morning") resolve automatically.
Tap COPY on any example to paste it into WhatsApp and edit the details.

TICKETS & LOOKUPS

▾
PULL A TICKET — customer, phone, scope, status
show me CC-677
PIPELINE CHECK — list a stage
what's in follow up for CC
FIND BY CUSTOMER NAME
find the ticket for Delgado
NEW LEADS CHECK
any new leads today
CUSTOMER PHONE, FAST
what's the phone number on GSC-241

SCHEDULING

▾
BOOK AN ESTIMATE — pulls ticket, books calendar, invites customer, moves status
cc 677 needs an estimate tuesday at 5pm
CHECK THE CALENDAR
what's on the calendar tomorrow
RESCHEDULE
move the Delgado estimate to thursday at 3
Booking auto-includes: confirmed status, address as location, phone + scope in the notes, email invite to the customer, ticket → Estimates Scheduled.

ESTIMATES & PRICING

▾
RATE CHECK — reads the wiki, tags confidence
what's the rate for 1x6 cedar trim
BUILD AN ESTIMATE — itemized table + QB block on the ticket
build an estimate for CC-650: 40 ft of 1x8 fascia replacement, house wash, paint the trim
CORRECT A LINE — bot re-renders the whole table
change the house wash to 600
VERBIAGE PULL
give me the 5 year paint warranty language
Rates tagged VERIFY in the wiki come back as "around $X — confirm before quoting." That's on purpose.

STATUS MOVES

▾
MOVE A TICKET
move GSC-241 to follow up
MARK SOLD
mark CC-645 sold
DEAD LEAD
CC-644 is not qualified, close it out
Stage names are forgiving — "sold" works for GSC's Won In Progress too; the bot resolves the right status per company.

QUICKBOOKS

▾
CREATE THE QB CUSTOMER FROM A TICKET
add QB customer for CC-677
QB BLOCK ON DEMAND
post the QB block for CC-639 again

NOTES & MEMORY

▾
ADD A TICKET NOTE
add a note to CC-639: customer wants the darker trim color, call before ordering paint
PERSONAL TASK
remind me to call the supplier about cedar stock
RATE CHANGE — routes to the wiki via Claude
new standing rate: gutter cleaning is 129 now
A new rate stated to the bot applies to that job only until it's pushed to the wiki — the bot will remind you to have Claude update the shared rules.
Ask the assistant anything about CALEB's jobs — same engine as the WhatsApp bot, scoped to the selected crew. Every action is logged.
ASSISTANTReady. Ask me something about your jobs.

HOW THIS WORKS — LIVE AT /crew.html

▾
The real portal is live: dash.gutterslayer.com/crew.html. Each person signs in once with their own code (revocable individually). This tab's buttons are a demo of the same assistant.
Job lists per person: Caleb = jobs Steve tags crew-caleb · Jason = GSC work queue · Robin = CC tickets assigned to her. Everyone gets the field view — customer, phone, address, scope, flags, photos. No pricing, no email, no other company's pipeline.
Mark Complete moves the ticket (CC → Done, GSC → Que For Quickbooks) and signs it "via crew portal" — Steve sees it on the board instantly.
EDIT — ESTIMATING.MD